Welcome to Anagrammer Crossword Genius! Keep reading below to see if irepowers is an answer to any crossword puzzle or word game (Scrabble, Words With Friends etc). Scroll down to see all the info we have compiled on irepowers.
irepowers
Searching in Crosswords ...
The answer IREPOWERS has 0 possible clue(s) in existing crosswords.
Searching in Word Games ...
The word IREPOWERS is NOT valid in any word game. (Sorry, you cannot play IREPOWERS in Scrabble, Words With Friends etc)
There are 9 letters in IREPOWERS ( E1I1O1P3R1S1W4 )
To search all scrabble anagrams of IREPOWERS, to go: IREPOWERS?
Rearrange the letters in IREPOWERS and see some winning combinations
Scrabble results that can be created with an extra letter added to IREPOWERS
7 letters out of IREPOWERS
6 letters out of IREPOWERS
5 letters out of IREPOWERS
4 letters out of IREPOWERS
3 letters out of IREPOWERS
Searching in Dictionaries ...
Definitions of irepowers in various dictionaries:
No definitions found
Word Research / Anagrams and more ...
Keep reading for additional results and analysis below.
Irepowers might refer to |
---|
Iru Power Plant is a co-generation power plant in Iru village, Maardu, Estonia. It is a subsidiary of Eesti Energia. * The first unit of power plant was commissioned in 1978. In the beginning it operated as a boiler plant. In 1980, it was converted into co-generation power plant.* The power plant has three power units with capacities of 80 MWe, 110 MWe and 17 MWe. The primary fuel of the units 1 and 2 is natural gas and reserve fuel is fuel oil, unit 3 mixed municipal waste. Total installed capacity is 207 MW of electricity, 661.5 MWth of hot water and 162 of MWth steam. In co-generation mode the heating capacity is 398 MWt. It supplies heat to Maardu, and the Lasnamäe and central districts of Tallinn. * In 2006, Eesti Energia started preparations for construction of a waste incineration unit with capacity of 50 MW of heat and 17 MW of electricity. Construction started in 2010. It was commissioned on 16 June 2013. The unit processes up to 220,000 tonnes of mixed municipal waste per year. The unit was built and technology was provided by Constructions industrielles de la Méditerranée (CNIM). The general construction was carried out by Merko Ehitus, with the incineration grate supplied by Martin GmbH and the system for the treatment of waste gas by LAB, a subsidiary of CNIM. The unit cost about €105 million. |